1
/
of
10
Lysken. Smart Building. Beautifully Lit.
Modern Minimalist Compressed Sherpa Sofa - Wave-Shaped S-Curve Lounge Chair For Living Room
Modern Minimalist Compressed Sherpa Sofa - Wave-Shaped S-Curve Lounge Chair For Living Room
Regular price
$12,341.00 USD
Regular price
$17,277.00 USD
Sale price
$12,341.00 USD
Taxes included.
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Unbox Comfort. Expand Your Space.
Elevate your space with this modern minimalist compressed sherpa sofa, a fluid wave-shaped design that redefines relaxed living. Crafted with vacuum compression technology, it ships compactly for effortless delivery through elevators and narrow doorways, ideal for apartments and small-space living. Upholstered in soft, plush sherpa fabric and filled with dense high-density sponge, it delivers enveloping, supportive comfort that wraps you in warmth.
"Designed to compress for delivery - crafted to impress when fully expanded."
| Description | |
| Product Type | Sofa |
| Number of Items Included | 1 |
| Style | Minimalist |
| Color | White |
| Occasion | Living Room |
| Seating Material | Sherpa |
| Frame Material | Sherpa, Sponge |
| Seat Back | Yes |
| Dimensions | |
| Overall Length | 22.83"/58cm |
| Overall Width | 62.99"/160cm |
| Overall Height | 29.92"/76cm |
| Features | |
| Seat Fill Material | High-Resilience Sponge |
| Arms Included | Armless |
| Foldable | No |
| Stackable | No |
| Height Adjustable | No |
| Preassembled | Yes |
| Note |
| Due to manual measurement, there may be a 0.4"-1.2" (1-3cm) difference in size. Additionally, slight color variations may occur due to lighting and monitor differences. Thank you for your understanding. |
Key Features
-
Compression Design for Easier Living
Ships compactly to simplify delivery and moving �ideal for apartments, condos, and tight spaces. -
Sculptural Curved Silhouette
Wave-inspired contours align with the growing demand for soft, organic furniture shapes that enhance comfort and visual flow. -
Plush Sherpa Upholstery
A tactile, cozy fabric that adds warmth, texture, and a welcoming feel to modern interiors. -
Supportive High-Density Foam
Balances softness with structure to maintain shape while providing lasting comfort. -
Ottoman for Flexible Comfort
Use it as a footrest, extension seat, or casual lounge surface to adapt your space effortlessly. -
Statement Accent Appeal
Search interest for accent seating remains consistently strong, reflecting ongoing consumer demand for decorative yet functional seating pieces.



Share
